Beta — site is under development, information may contain errors. Read disclaimer

Frisco Building Permits — Codes, Process & Inspections

Last updated: Verified:

Building Permits in Frisco

Frisco's Building Inspections Division administers building permits and inspections. The city requires building-permit applications to be submitted online through its Plans and Permits system.

Current Codes

Frisco's adopted-code page lists the 2024 International Building Code, with local amendments, effective March 1, 2026. The city publishes the other currently adopted construction codes and amendments on the same official page. For electrical work, verify the currently effective code shown by the city and applicable Texas law at the time of filing.

Permit Process

  1. Confirm zoning and project-specific requirements.
  2. Select the correct permit type in the city's Plans and Permits portal.
  3. Upload the plans and documents required for that permit type.
  4. Pay the applicable submittal and permit charges shown by the city.
  5. Respond to plan-review comments when corrections are requested.
  6. After issuance, request required inspections through the city's system.
  7. Complete final inspections and any occupancy process applicable to the project.

Fees

Fees are project-specific. Frisco states that a 6% Technology Fee applies beginning August 1, 2026 to permits, projects, licenses, and other submittals processed through its land-development and permitting system, with limited exclusions in Ordinance 2026-05-40. Other permit and submittal fees depend on the application; use the city's current fee information rather than a generic percentage estimate.

Review Time

No universal review duration is stated here. Review depends on permit type, completeness, corrections, and any additional approvals. Contact the city or use the portal for the status of a specific application.

Inspections

Inspection requirements depend on the permitted work. Follow the inspection instructions attached to the project and use the city's current scheduling process. Do not rely on a generic inspection list for a particular permit.

Design Professionals

Whether plans must be prepared or sealed by a Texas-licensed architect or engineer depends on the project and applicable state law. Confirm the requirement for the actual scope before submission.

Official Sources

The Building Inspections Division and the city's Adopted Codes page are the primary sources for current Frisco permit procedures and construction-code editions.

More about Frisco Zoning

Sources

  1. Frisco Building Inspections Division·friscotexas.gov·Accessed 2026-09-23·Direct link
  2. Frisco Adopted Codes·friscotexas.gov·Accessed 2026-09-23·Direct link

FAQ

How do I apply for a building permit in Frisco?
Frisco states that building-permit applications must be submitted online through its Plans and Permits portal.
Which building code does Frisco use?
Frisco's official adopted-code page lists the 2024 International Building Code with local amendments as effective March 1, 2026, along with other currently adopted codes.
Is there a technology fee in Frisco?
Yes. The Building Inspections Division states that a 6% Technology Fee applies to permits, projects, licenses, and other submittals processed through the city's land-development and permitting system beginning August 1, 2026, subject to the exclusions in Ordinance 2026-05-40.