Beta — site is under development, information may contain errors. Read disclaimer

Sammamish Zoning & Land Use Guide

Last updated: Verified:

Key Zoning Facts

Planning Department
City of Sammamish Community Development(425) 295-0500
Building Code Edition
WA State Building Code (IBC/IRC based)
ADUs Allowed
Yes
Primary District
R-1 Residential 1
Max Height
35 ft

Sammamish Zoning Overview

Sammamish is a city in Washington with approximately 65,892 residents, located in King County on the Sammamish Plateau. The city manages land use and development through its zoning code, administered by the Community Development Department. Sammamish's zoning divides the municipality into districts regulating permitted uses, building heights, lot sizes, setbacks, and density.

Sammamish follows the Washington State Building Code (WAC 51-50/51), which is based on the International Building Code (IBC) and International Residential Code (IRC).

Primary Zoning Districts

Sammamish is predominantly a residential community. The R-1 district requires a minimum lot size of 1 acre for estate-style development. The R-4 district allows approximately 4 units per acre with 9,000 square foot lots. The R-6 district allows 6 units per acre with 7,000 square foot lots. The R-8 district supports 8 units per acre with 4,500 square foot lots. All residential districts have a 35-foot height limit.

Limited commercial activity is served by the NB (Neighborhood Business) and CB (Community Business) districts.

ADU (Accessory Dwelling Unit) Rules

Sammamish allows ADUs (Accessory Dwelling Units). Under Washington state law HB 1337 (2023), cities are required to allow ADUs, with up to 2 ADUs permitted per lot in most areas. This is a state mandate that applies to all Washington cities. Contact the Community Development Department for current requirements including size limits, setbacks, and permitting procedures.

Development Process

Development in Sammamish generally requires obtaining the appropriate permits. The process typically involves:

  1. Zoning Verification — Confirm that your proposed use is permitted in the applicable zoning district
  2. Site Plan Review — For commercial and multi-family projects, submit a site plan for review
  3. Building Permit — Apply for a building permit with construction documents
  4. Inspections — Schedule required inspections during construction
  5. Certificate of Occupancy — Obtain final approval before occupying the structure

For projects that do not conform to existing zoning, property owners may need to seek a variance, special exception, or rezoning.

Key Considerations

Before starting any development project in Sammamish, property owners should:

  • Verify the zoning classification of their property
  • Review setback, height, and lot coverage requirements for their specific district
  • Check for any overlay districts or special regulations
  • Determine if the property is in a flood zone using FEMA's flood map service
  • Confirm whether HOA covenants or deed restrictions apply
  • Contact Community Development at (425) 295-0500 for pre-application guidance

Disclaimer: This guide provides general information about zoning in Sammamish and should not be relied upon as legal advice. Zoning codes are subject to change. Always verify current regulations with the City of Sammamish or the municipal code before making development decisions.

Regulatory Layers That Apply in Sammamish

Your property is subject to ALL of these regulatory layers. Each one can impose additional requirements beyond the others.

Federal

State — Washington

  • Building Code: WA State Building Code (WAC 51-50/51)
  • State ADU Override: Yes (WA HB 1337 (2023) requires cities to allow ADUs; 2 ADUs per lot in most areas)
View Washington zoning overview

County — King County

  • Role: County-level property records, tax assessment, unincorporated area planning

City / Municipal

The city's zoning ordinance, building codes, and local permits form the primary layer of land-use regulation for your property.

Overlay Districts

No overlay districts identified.

Private Restrictions

  • HOA / CC&Rs common: Yes
  • Check HOA CC&Rs and deed restrictions for additional requirements.

Primary Zoning Districts

R-1Residential 1
Min Lot
1 acre
Max Height
35 ft
Front Setback
30 ft
Side Setback
10 ft
Rear Setback
25 ft
R-4Residential 4
Min Lot
9,000 sq ft
Max Height
35 ft
Front Setback
20 ft
Side Setback
5 ft
Rear Setback
25 ft
R-6Residential 6
Min Lot
7,000 sq ft
Max Height
35 ft
Front Setback
20 ft
Side Setback
5 ft
Rear Setback
20 ft
R-8Residential 8
Min Lot
4,500 sq ft
Max Height
35 ft
Front Setback
15 ft
Side Setback
5 ft
Rear Setback
20 ft
NBNeighborhood Business
Min Lot
Varies
Max Height
Varies
Front Setback
Varies
Side Setback
Varies
Rear Setback
Varies
CBCommunity Business
Min Lot
Varies
Max Height
Varies
Front Setback
Varies
Side Setback
Varies
Rear Setback
Varies

ADU Rules in Sammamish

ADUs:Allowed

Permit Costs & Timelines

Permit Costs & Timelines

Specific permit fee schedules for Sammamish are available from the local planning department. Fees vary based on project type, scope, and valuation.

Check Sammamish permit fees →

Official Sources

Frequently Asked Questions

How do I find the zoning for my property in Sammamish?
Contact Community Development at (425) 295-0500 or visit sammamish.us.
What building code does Sammamish follow?
Sammamish follows the Washington State Building Code (WAC 51-50/51), which is based on the International Building Code (IBC) and International Residential Code (IRC).
Do I need a permit for home improvements in Sammamish?
Most structural modifications, additions, and changes of use require a building permit. Contact Community Development at (425) 295-0500 for specific requirements.
Can I build an ADU (Accessory Dwelling Unit) in Sammamish?
Yes. Washington state law (HB 1337, 2023) requires cities to allow ADUs. Sammamish permits up to 2 ADUs per lot. Contact Community Development for current requirements.