Huntsville Building Permits — Cost, Timeline & Process

Last updated: Verified:

The City of Huntsville Inspection Department administers building permits, plan review, and inspections for work inside Huntsville city limits. Projects can also require review by Planning, Zoning, Engineering, Traffic Engineering, Water Pollution Control, Natural Resources, the City Clerk, or Legal depending on scope.

Current Adopted Codes

The City's current Inspection requirements page lists these technical codes:

  • 2018 International Building Code (IBC)
  • 2018 International Residential Code (IRC)
  • 2018 International Mechanical Code (IMC)
  • 2018 International Plumbing Code (IPC)
  • 2018 International Fuel Gas Code (IFGC)
  • 2018 International Existing Building Code (IEBC)
  • 2018 International Swimming Pool and Spa Code (ISPSC)
  • 2015 International Energy Conservation Code (IECC / Alabama Energy Code)
  • 2017 National Electrical Code (NEC)

Huntsville Fire & Rescue separately lists the 2021 International Fire Code (IFC) with the City's stated appendix exclusions. Use the City's current code page rather than assuming Huntsville has moved to the 2021 IBC/IRC family.

How to Submit Plans

All commercial and residential projects that require plan approval are submitted through Huntsville ePlans Review.

The ePlans system is used to:

  • submit the permit application and PDF plans;
  • track review status;
  • receive marked-up plans and review comments;
  • upload revisions for a correction cycle; and
  • receive the Ready for Issuance notice after approval.

The City specifically warns applicants not to delete prior plan files when resubmitting revisions because doing so can force a full resubmission.

Minor residential repairs or alterations that do not require plan review may qualify for a walk-in permit. Residential permits submitted through ePlans must still be picked up in person after processing and approval.

Permit Costs

Huntsville publishes its current building-permit fee formulas.

For a new single-family dwelling:

  1. heated square footage × $15.00;
  2. unheated square footage × $7.50;
  3. add those values and multiply the total by 0.0055.

For other building permits, the City states that the permit is calculated from the total contracting price × 0.0055.

Electrical, plumbing, gas, and mechanical work requires the appropriate separate trade permits. Always use the current City fee page when budgeting because the published formula can be amended.

Review Time

There is no single official "2–4 week" review promise that applies to every Huntsville project on the City permit pages used for this guide.

Review time depends on:

  • project type and complexity;
  • whether the submission is complete;
  • the number of City departments that must review it;
  • zoning, engineering, floodplain, or other approvals; and
  • correction and resubmittal cycles.

Use the live status in ePlans and contact Inspection Services at 256-427-5331 when a project schedule depends on current review workload.

Flood Hazard Areas

The City gives projects in FEMA Special Flood Hazard Areas a different workflow.

Its permit page states that:

  • a project located in a FEMA Special Flood Hazard Area must be submitted in person; and
  • building permits and most standalone trade permits require a Flood Development Permit (FDP) before other permit approval.

Use the City's GIS flood layer and confirm the requirement with Inspection Services or Engineering before filing.

Typical Permit Process

  1. Confirm the parcel's zoning district and any overlay or special approval.
  2. Determine whether the project requires plan review.
  3. Prepare the permit application and required PDF drawings.
  4. Submit projects requiring plan approval through ePlans.
  5. Respond to departmental review comments and upload revisions without deleting prior files.
  6. After approval, follow the Ready for Issuance instructions and pay applicable fees.
  7. Keep the issued permit and approved documents available at the job site.
  8. Schedule and pass the required inspections before final approval or occupancy.

Special Reviews

Some projects require additional documentation before permit issuance. Examples listed by the City include:

  • Board of Zoning Adjustment approvals;
  • Planning Commission Location, Character and Extent approval for qualifying public projects;
  • Research Park Board approval for projects in Research Park districts;
  • floodplain approval;
  • landscaping/photometric plans for qualifying commercial development; and
  • Natural Resources review for certain demolition, renovation, or addition work.

Official Sources

Use the City of Huntsville Building License & Permits, ePlans Review, Inspection Requirements, and Permit Costs pages linked in this guide's sources.

Disclaimer: This page is a practical summary, not a substitute for the current City code, permit instructions, or project-specific review. Confirm current requirements with Huntsville Inspection Services before filing or starting regulated work.

More about Huntsville Zoning

Sources

  1. City of Huntsville — Building License & Permits·huntsvilleal.gov·Accessed 2026-10-04·Direct link
  2. City of Huntsville — ePlans Review·huntsvilleal.gov·Accessed 2026-10-04·Direct link
  3. City of Huntsville — Inspection Codes·huntsvilleal.gov·Accessed 2026-10-04·Direct link
  4. City of Huntsville — Permit Costs·huntsvilleal.gov·Accessed 2026-10-04·Direct link

FAQ

How do I submit a Huntsville building permit that requires plan review?
All commercial and residential projects requiring plan approval are submitted through the City of Huntsville ePlans Review system. The portal is used to upload PDF plans, receive review comments, resubmit corrections, and track approval status.
Which building codes does Huntsville currently use?
Huntsville Inspection lists the 2018 IBC, IRC, IMC, IPC, IFGC, IEBC and ISPSC, the 2015 IECC, and the 2017 NEC, with City amendments. Huntsville Fire & Rescue lists the 2021 IFC. Check the City's current code page before filing because editions can change.
How are Huntsville building permit fees calculated?
The City publishes a formula. New single-family permit cost uses heated area × $15 plus unheated area × $7.50, with the sum multiplied by 0.0055. Other building permits use total contracting price × 0.0055. Trade permits are separate.
How long does Huntsville plan review take?
The City does not publish one universal turnaround time for all projects on the permit sources used for this guide. Timing depends on project scope, completeness, required departmental reviews, and correction cycles. Track the current review in ePlans or contact Inspection Services at 256-427-5331.
What if my Huntsville property is in a FEMA Special Flood Hazard Area?
The City states that projects in a FEMA Special Flood Hazard Area must be submitted in person and that building and most standalone trade permits require a Flood Development Permit before other permit approval.